Juwei DD128 guide rod diesel hammer has successfully arrived in Indonesia. This hammer provides piling tasks for large offshore port projects.
Juwei’s pile driving equipment successfully assisted in the deep foundation project of Indonesian offshore ports. This represents the further expansion of Juwei in the international market.
Specifications of DD128 Guide Rod Diesel Hammer
- Project pile type: Round steel piles
- Lifting equipment: Crawler Crane
- ICylinder Complex Mass: 12800 kg
- Max. Cylinder Stroke: 3 m
- Max. Energy: 384 kj
The DD128 hammer is designed for easy maintenance. It’s can reducing downtime and improving work efficiency.
Localized After-sales Service
After the equipment arrived in Indonesia, Juwei after-sales service team began to prepare to leave for Indonesia. Juwei personnel arrangement: 2 senior engineers + 1 project manager. They need to ensure the smooth installation and use of Juwei DD128 guide rod hammer.
DD128 Hammer Installation
Engineers guide the customer in the assembly of the DD128 hammer. Ensure that it meets the safety requirements for equipment installation.
At the project site, the hammer is lifted using a crawler crane. The hammer is then lifted onto a pole for equipment commissioning.
The entire installation process requires careful attention to ensure that all parts of the guide rod diesel hammer are assembled according to the specifications of the Juwei manufacturer.
Onsite Training
At the commissioning site of the DD128 guide rod diesel hammer, the Juwei technical team also trained the technical and operating personnel on site, starting from equipment startup, parameter adjustment, troubleshooting, etc., so that the customer’s technical team can quickly learn the key points.
Through 48 hours of high-intensity practical training, the Indonesian technical team can independently complete daily equipment inspection and maintenance, common fault diagnosis and emergency treatment, and operating parameter optimization.
Conclusion
The Juwei DD128 guide rod diesel hammer was successfully delivered to Indonesia, and the training, installation and commissioning were successfully completed. This marks another important breakthrough in the expansion of Juwei pile hammer in the Indonesian deep foundation engineering market and technical service capabilities.
From the arrival of the equipment on site to employee training, equipment installation and commissioning. The Juwei team has demonstrated excellent professionalism. We not only ensure the stable operation of the equipment, but also cultivate a high-quality local technical team for customers.
This time, the DD128 guide rod diesel hammer assisted the Indonesian offshore deep foundation construction. It is not only the delivery of equipment, but also the transmission of technology, service and trust. Juwei will continue to uphold the concept of “quality-oriented, service-oriented” to provide better services to global customers.
If You Need Piling Equipment, You Can Consult Juwei Piling Experts Immediately!